Begin moving books
Preparation in the Todd Wehr Library
• Take delivery of more porta-racks
• Finish marking boxes for move
• Finish packing
• Posts signs in public areas about status of computers,, noise levels, elevator availability
• movers begin filling porta-racks with library material
Monday, June 22, 2009
• Move offices
• Unpack boxes
• Set up computers, printers, faxes, etc. in offices
• Take delivery of maps
• Test smoke and special collections alarms
• Walk through stack areas and small collection areas with movers
• Move microfilm cabinets and map cabinets
• Test keys
Preparation in the Todd Wehr Library
• Load more porta-racks
• Continue circulation and reference assistance
What’s happening in the Mulva Library?
• Begin shelving the 000.s on the second floor
• Begin shelving the 600s on the third floor
• Begin shelving the bound serials
• Begin shelving the reference material
• Put together monitors and computers in the Instructional Lab
Tuesday, June 23, 2009
Preparation in the Todd Wehr Library
• Load more porta-racks
• Continue circulation and reference assistance
What’s happening in the Mulva Library?
• Begin shelving the 000.s on the second floor
• Begin shelving the 600s on the third floor
• Begin shelving the bound serials
• Begin shelving the reference material
• Put together monitors and computers in the Instructional Lab
Wednesday, June 24, 2009
Preparation in the Todd Wehr Library
• Load more porta-racks
• Continue circulation and reference assistance
• Begin packing archives in porta-racks
• Pack up current periodicals in porta-racks
What’s happening in the Mulva Library?
• Put together monitors and computers for instructional lab and reference area
• Walkthrough and sign off of shelving, etc.
• Testing of smoke and special collections alarms
• Continue shelving of the general collection
• Continue shelving reference material
• Continue shelving bound journals
• Move microfilm cabinets to final resting place
• Begin signage installation
Thursday, June 25, 2009
Preparation in the Todd Wehr Library
• Load more porta-racks
• Continue circulation and reference assistance
What’s happening in the Mulva Library?
• Put together monitors and computers for instructional lab and reference area
• Continue shelving of the general collection
• Continue shelving reference material
• Finish moving archives
• Finish shelving current periodicals
• Finish shelving bound journals
• Signage installation
• Detection system installation
Friday, June 26, 2009
Preparation in the Todd Wehr Library
• Load more porta-racks
• Continue circulation and reference assistance
• Final walkthrough of building to check that all library material has been moved
What’s happening in the Mulva Library?
• Test monitors and computers in instructional lab and reference area
• Finish shelving of the general collection
• Finish shelving reference material
• Finish moving archives
• Finish shelving current periodicals
• Finish shelving bound journals
• Continue signage installation
• Finish installation of barcode scanners, computers, etc. at the information desk
June 26, 2:45p.m - Last book removed from the shelves in the Todd Wehr Library!
July 17, 2009, The Miriam B. & James J. Mulva looks fabulous. Come and check it out!
Aug. 30, 2009, Dedication & Grand Opening of Mulva Library
|